GARETH EDWARDS

Fixed Plant Shutdown / Asset Management Planner

RIO TINTO

I approached Metro to assist with reverse engineering the requirements,

with the intention of placing an express order.

The entire management team at Metro assisted with the project that was of high priority.

The total timeframe from conceptional reverse engineering, manufacturing

and delivery to site was 2 weeks.

When the liner packages were installed, the precision work of Metro resulted in a package that fit

far better than the OEM supplied product.

Not only was the product of better quality, the costings were very competitive.