METRO STEEL FABRICATION WA 2017.

I approached Metro to assist with reverse engineering the requirements,

with the intention of placing an express order.

The entire management team at Metro assisted with the project that was of high priority.

The total timeframe from conceptional reverse engineering,

manufacturing and delivery to site was 2 weeks.

When the liner packages were installed, the precision work of Metro resulted in a package

that fit far better than the OEM supplied product.

Not only was the product of better quality, the costings were very competitive.

GARETH EDWARDS

Asset Management Planner

Rio Tinto

TESTIMONIALS